10-Tonne Pipe Bridge Installation
CLIENT: Tarbert Power Station
Kerry Mechanical Engineering were engaged to design, construct and install a 10-tonne pipe bridge installation at Tarbert Power Station in Co. Kerry.
This job combined several of our core services: fabrication, welding, shotblasting, painting, machining and precision engineering and included installation in a marine environment.






