10-Tonne Pipe Bridge Installation

CLIENT: Tarbert Power Station

Kerry Mechanical Engineering were engaged to design, construct and install a 10-tonne pipe bridge installation at Tarbert Power Station in Co. Kerry.

This job combined several of our core services: fabrication, welding, shotblasting, painting, machining and precision engineering and included installation in a marine environment.

Want something similar?